PROJECTS / YUEN LONG KIDS' BEDROOM

Yuen Long kids' bedroom tatami bed project

A sea-view window-side tatami bed, full-height wardrobe, desk and under-bed drawers integrate sleep, study, clothes and bedding storage for a Hong Kong family bedroom.

Window-side tatami bed and full-height wardrobe as one

The tatami bed fits the window and wall dimensions precisely, with under-bed drawers storing bedding and off-season items; the full-height wardrobe and desk on the left connect as one piece, reducing loose furniture in the small room.

Tatami bed, wardrobe and desk integrated

The bed, wardrobe, desk and open niches share the same light-wood and cream doors, with under-bed drawers and warm LED strips balancing storage and atmosphere — built for long-term family use in Hong Kong.

KEY FEATURES

Design highlights

MORE PROJECTS

More projects